Construction progress updated in September 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

In September 2021, despite being affected by the Covid-19 pandemic and rainy weather etc., INVESTCORP Land Thanh Hoa Company still overcomes difficulties to implement some work items of the Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province. The works performed during the month includes dredging, ground excavation and excavation of roads and embankment of K95 and K98 soils for the foundations of roads No. 1, 2, 3A, 4, 5, 6, 8, 9, 10 & 11 reaching 70% of total workload; precast of concrete structures for drainage and electrical systems.

According to the construction plan in October 2021, INVESTCORP Land Thanh Hoa will continue to dredge and embank K95, K98 for the remaining roads after completing the site clearance, gathering the base for construction; continue to construct the foundation of medium and low voltage power lines, relocate low voltage power lines, construct component castings and install surface water drainage systems on the main roads of the project.

Other news